This project included the plumbing & HVAC piping for the Samsung A2 Fabrication Plant. The chilled water, heating water, steam/condensate, water spray and instrument air piping were furnished and installed by Brandt. Additionally, Brandt installed 213 Owner-furnished dry cooling coils and performed the piping hookups to 5 make-up air units and 26 Owner-furnished air handlers.

Brandt met the challenges of performing the $20,000,000 scope of work in less than 6 months by employing over 150 craftsmen working extended shifts. Extensive coordination with other trades was required as well as the logistics of material staging. Brandt utilized the capabilities of its in-house fabrication shop to prefabricate piping spools to expedite installation, while minimizing its crew size in the field.

 

Owner: Samsung
Contractor: Brandt Industrial
Project Size: 1,200,000 SF
Start/Completion: 2005 - 2007
Project Amount: $20,000,000
Brandt Role: Mechanical & Piping Services